Issued lab still, 2021-02-10: working room with wall-mounted plant, benches on casters, wall lights on

Training lab

Fail in the LAB, not in the FIELD

Excellence comes through failure. Magenta just makes sure the failing happens here.

A city in a lab

Every piece is live plant

Every piece of equipment Magenta has ever installed in the field is a live part of this real, working network. It is not a mock-up and it is not a poster on the wall. It is the same plant the customers run on.

The lab gives technicians a safe, controlled place to learn before they go to the field, where time, safety, quality, and money are all on the line at once.

Better technicians get better results for the customer.

  1. 01Intent / Design
  2. 02Shell & stations
  3. 03Live plant in the lab
  4. 04Network build-out
  5. 05Shell & stations
  6. 06Network build-out
  7. 07Working city

Hard standard

Know the plant before the field

Technicians know the plant before they go to the field. A part they have never seen, worked with, or repaired does not show up for the first time on a trouble call. Magenta considers that unacceptable.

01, 2020-05-14 to 2020-06-30

Intent / Design

The thought went on the board before the first mount went on the wall. It was drawn by hand and dated, and the early bench boards sit alongside that first sketch.

Issued lab still, 2020-06-30: hand-drawn whiteboard sketch of the lab layout

2020-06-30/lab-09

Hand-drawn: three stations and the cable run between them. The thought went on the board first.

02, 2020-07-23 to 2020-08-27

Shell & stations

An empty hall with boards on stands and the tables set. A RAPIDLINK face and the first furnished room fall in this stretch of dates.

Issued lab still, 2020-07-23: empty hall, wide

2020-07-23/lab-10

The empty hall, seen wide.

03, 2020-09-29

Live plant in the lab

Closures on the bench, practice walls dressed, and the whole room in one view, with a port map taped to the box. This is where the plant starts running.

Issued lab still, 2020-09-29: lab overview with whiteboard notes and plywood stations

2020-09-29/lab-16

An overview of the room: whiteboard notes, plywood stations, and gear on the table.

04, 2021-01-04

Network build-out

The board gets the plant sketch, with the cases and counts written as they were. Design intent, by hand, before the build.

Issued lab still, 2021-01-04: the whiteboard becomes reality; every fiber, every closure, every burn and pathway started right here

2021-01-04/lab-21

The whiteboard becomes reality. Every fiber, every closure, every burn and pathway started right here.

05, 2021-01-15

Shell & stations

An empty room with the floor marked and mounts on the wall. It is the next shell, in date order.

Issued lab still, 2021-01-15: empty room, wall hooks, marked plywood floor

2021-01-15/lab-22

The same room, closer in: hooks on the wall, the floor grid marked, nothing live yet.

06, 2021-01-21 to 2021-01-28

Network build-out

The table goes in, cable goes on the floor, boxes go up on the wall, and the fan-outs follow. The city fills in.

Issued lab still, 2021-01-21: work table and cable on the floor

2021-01-21/lab-23

The table is in and cable is on the floor. The walls are still waiting.

07, 2021-02-02 to 2021-02-11

Working city

Labeled stations, closures on the wall, and live plant. The room is working. A few yard stills from the same training set close out the run.

Issued lab still, 2021-02-10: working room with wall-mounted plant, benches on casters, wall lights on

2021-02-10/lab-37

The working room, with the wall plant live and the benches set.

Straight

The photos carry it

These are 43 stills from the lab, shown in the order they were taken, from the first sketch on a board to a working city. There are no miles, crew counts, or spend figures here. Magenta Systems, LLC does not add a story the photos do not support.

To bring your technicians through, or to have your plant built by people who trained here, call 704-457-1162. The phone is answered 24 hours a day.

Contact